Stena Line logo

Stena Line Update : Cairnryan - Belfast Additional Dry Dock (01/03/2020 - 03/03/2020)

Stena Line wishes to advise customers that Stena Superfast VIII which operates on the Cairnryan - Belfast route is required to attend dry dock for a short period from 1st March until 3rd March 2020.

During this period the Stena Superfast X will operate as the cover vessel delivering the normal route schedule. There will however be a maximum height limit of 4.65m for traffic on Stena Superfast X sailings.

Stena Line Freight

Cairnryan - Belfast Additional Dry Dock Timetable

27 February 2020

Search and Book

Fri, 29 Mar 2024
Sat, 30 Mar 2024
Need help?